Abstract

Equitable electricity access is still a challenge in the more isolated and remote parts of Indonesia, where electricity access is geographically limited, operationally expensive and heavily dependent on highly emitting diesel power plants. In this study, a occupational health and safety-compliant implementation strategy of household rooftop PV systems is analyzed to enable energy transition and decarbonization using tiered load scenarios based on household size and efficient appliance profiles. The results show a daily energy demand ranging from 2.66–5.71 kWh/day and a required PV capacity between 0.79 and 1.69 kWp. From an economic perspective, rooftop PV LCOE without battery storage is estimated at Rp 1,475–1,485/kWh, while the hybrid PV-BESS configuration ranges from Rp 2,753 to 2,772/kWh. The battery option, while more expensive, is still relevant for regions with high nighttime demand, unreliable supply or for off-grid operation. In Scenario 5 with , rooftop PV becomes increasingly competitive at community scale, with LCOE declining to approximately Rp 2,217/kWh (for 50 households), well below diesel-based power supply costs of about Rp 4,791/kWh. Second, community-scale PV can avoid more than 81.6 ton CO₂e per annum by replacing diesel generation. The implementation of PV rooftop in remote and isolated regions must comply with the occupational health and safety aspect as a core requirement, especially for DC protection, grounding, quality of connector, roof structural integrity, and operation certification.

Downloads

Download data is not yet available.

References

Clean Development Mechanism. (2025). Methodological tool Default values for common parameters. https://cdm.unfccc.int/methodologies/PAmethodologies/tools/am-tool-33-v3.pdf

Damayanti, H., Tumiwa, F., & Citraningrum, M. (2019). Residential Rooftop Solar Technical and Market Potential in 34 Provinces in Indonesia. https://iesr.or.id/wp-content/uploads/2019/07/IESR-Technical-Note-Residential-Rooftop-Solar-Potential-in-34-Provinces-ID.pdf

Dinas ESDM, K. (2026, January 19). Dinas ESDM Kaltara dan Kementrian ESDM Laksanakan Survei PLTS di Wilayah Perbatasan dan Pedalaman. https://desdm.kaltaraprov.go.id/berita/dinas-esdm-kaltara-dan-kementrian-esdm-laksanakan-survei-plts-di-wilayah-perbatasan-dan-pedalaman.html

Fifianny, H., & Setiabudy, R. (2025). Potensi Energi Listrik Dari Penggunaan PLTS Atap. Syntax Literate: Jurnal Ilmiah Indonesia, 9. https://doi.org/https://doi.org/10.36418/syntax-literate.v9i12.55850

Firdaus, A., & Amrina, U. (2025). Estimating the cost of producing grid-connected solar PV in Indonesia. BIO Web of Conferences, 159. https://doi.org/10.1051/bioconf/202515903004

Jaya, A. (2021). Optimasi Biaya Bahan Bakar Pembangkit Listrik Tenaga Diesel Menggunakan Metode Pendekatan Simplex. Empiricism Journal, 2(2), 112–118. https://doi.org/10.36312/ej.v2i2.1713

Jayawijaya, R. S. (2024, January 20). 2023, Konsumsi Listrik Indonesia Tembus 1.337 kWh per Kapita. https://www.jurnas.com/artikel/150121/2023-Konsumsi-Listrik-Indonesia-Tembus-1337-kWh-per-Kapita/

JDIH Marves. (2024, March 19). Permen ESDM 2/2024: Pembangkit Listrik Tenaga Surya Atap. https://jdih.kemenkoinfra.go.id/berita/permen-esdm-22024-pembangkit-listrik-tenaga-surya-atap

Kautsar Fattah, A., Haris Nafis, A., Prihantono, P., & Sadiawati, D. (2025). State Responsibility dalam Pemerataan Akses Energi Terbarukan di Wilayah 3T. Jurnal Cendekia Ilmiah, 5(1).

Kementerian ESDM. (2024, January 15). Kementerian ESDM Tuntaskan Program Elektrifikasi di Tahun 2024. https://www.esdm.go.id/id/media-center/arsip-berita/kementerian-esdm-tuntaskan-program-elektrifikasi-di-tahun-2024

Kompas TV. (2025, October). 115 Desa Ternyata Belum Teraliri Listrik Sejak Zaman Belanda. https://www.youtube.com/watch?v=0VstLXn1YQU

Lubis, A. A. (2022). Studi Kelayakan Teknis Dan Ekonomis Pembangkit Listrik Tenaga Hybrid PLTD-PLTMH (Studi Kasus : Pondok Afdeling IV PTPN 5 Sei Pagar). Universitas Islam Negeri Sultan Syarif kasim Riau.

Marwan, I. N. (2026, March 17). Panduan Membangun PLTS Rumah Tangga di Indonesia.

Massagony, A., Pandit, R., & White, B. (2026). Socioeconomic and climatic factors affecting household electricity consumption in Indonesia. Energy, 344. https://doi.org/10.1016/j.energy.2025.139749

Media Indonesia. (2025, November 19). Home Ekonomi Pemerintah Targetkan Percepatan Elektrifikasi Puluhan Ribu Lokasi Wilayah 3T. https://mediaindonesia.com/ekonomi/832029/pemerintah-targetkan-percepatan-elektrifikasi-puluhan-ribu-lokasi-wilayah-3t

Muhaini, Pangestu, W. Y., Afifah, N., & Hutagalung, Z. (2024). Etika Profesi Dan Profesionalisme. ETIKA PROFESI DAN PROFESIONALISME, 10. https://doi.org/https://doi.org/10.5281/zenodo.14370569

Panasonic. (2026). TH-43LS600G 43 inch, LED, Full HD Smart TV.

Putu, I., Pramayasa, Y., Nyoman, I., Kumara, S., Setiawan, N., Bukit, K., Kampus, R., Jimbaran, U., & Selatan, K. (2022). Survei Biaya Investasi Awal PLTS Atap di Indonesia Tahun 2022. Jurnal SPEKTRUM, 9(3). https://doi.org/https://doi.org/10.24843/SPEKTRUM.2022.v09.i03.p11

Pvsyst. (2026, June). Performance Ratio. https://pvsyst.com.cn/pvsyst72/source/performance_ratio.htm

Rianto, H. (2024). Analisa Keekonomian Dan Optimalisasi Pemodelan Sistem Pembangkit Listrik Hybrid Tenaga Diesel, Tenaga Surya Dan Tenaga Hydrogen Pada Pulau Sebesi Provinsi Lampung [Institut Teknologi PLN]. https://repository.itpln.ac.id/id/eprint/198/

Riawan, I. P. G., Kumara, I. N. S., & Ariastina, W. G. (n.d.). Analisis Performansi dan Ekonomi PLTS Atap 10 kWp pada Bangunan Rumah Tangga di Desa Batuan Gianyar. Majalah.Ilmiah.Teknologi,Elektro, 21(1). https://doi.org/10.24843/MITE.2021.v20i02.P09nnnnn

Rizkiawan, M. A., Aisyah, T., & Ramza, H. (n.d.). Pendekatan Profesionalisme dalam Proyek Keinsinyuran: Studi Kasus Smart Greenhouse Bertenaga Surya. Jurnal Profesi Insinyur Universitas Lampung (JPI), 6(2), 2722–5771. https://doi.org/10.23960/jpi.v6n2.259

Setiawan, V. N. (2026, June 4). 10.068 Wilayah RI Ini Belum Teraliri Listrik, Ini Paling Banyak. https://www.cnbcindonesia.com/news/20260604183347-4-740244/10068-wilayah-ri-ini-belum-teraliri-listrik-ini-paling-banyak

Solar Surya Indotama. (2024). Peraturan Menteri (PERMEN) No.2 Tahun 2024 Revisi Tentang Pemanfaatan PLTS Atap. https://solarsuryaindotama.co.id/news-and-updates/peraturan-menteri-permen-no-2-tahun-2024-revisi-tentang-pemanfaatan-plts-atap/

SolarVis. (2026, May 4). Solar Performance Ratio.

Solusi Power Indonesia. (2026, June). Biaya Pasang Panel Surya. https://www.solusipower.com/biaya-pasang-panel-surya/

Sukoco, H., & Widiastuti, I. A. M. S. (2021). Prinsip Dasar Etika, Profesi, dan Profesionalisme Bidang Teknologi Informasi. Universitas Terbuka. https://pustaka.ut.ac.id/lib/msim4408-etika-profesi/

Supriadi, S., & Sudiarto, B. (2026). Analisis Harga Pembelian Tenaga Listrik yang Optimal untuk Pembangkit Listrik Energi Terbarukan di Kawasan Timur Indonesia. Jurnal Energi Baru Dan Terbarukan, 6(3), 39–51. https://doi.org/10.14710/jebt.2025.26933

Thertina, M. R. (2026, May 12). Berapa Biaya Pasang PLTS Atap di Rumah? Ini Hitung-hitungan Awalnya.

Umiyan, A. (2024, January 18). Lampaui Target, Konsumsi Listrik RI Naik 14 Persen Jadi 1.337 kWh di 2023. https://www.idxchannel.com/economics/lampaui-target-konsumsi-listrik-ri-naik-14-persen-jadi-1337-kwh-di-2023

VoI. (2022, May 9). Rooftop PLTS Installation Costs Starting From IDR 14 Million Per KWp. https://voi.id/en/economy/165478

Wisnu Surya Pambudi, M., & Mufti Azis, M. (2025, February 20). Economic Analysis of The Project Development of Floating Solar Power Plants In Mrica Dam, Banjarnegara. ICoGEMT-4.

Yani, T. K. (2025, July 21). Kulkas 2 Pintu Berapa Watt? Cek Daya & Tips Hemat Listrik. Media Indonesia.

Zuhri, S. (2010). Etika Profesi Public Relations. Graha Ilmu. https://eprints.upnjatim.ac.id/3058/1/public_relations.pdf

Downloads

Published

2026-07-16

How to Cite

Wijaya, F., & Habibi, M. (2026). Case Study Of Uninterrupted Rooftop Solar PV Implementation Strategy In Remote And Isolated Regions. Indonesian Journal of Innovation Multidisipliner Research, 4(3), 2594–2609. https://doi.org/10.69693/ijim.v4i3.1464